Finished project
Others

Reform of Vall d'Hebron Fire Station

Av. Coll i Alentorn, 5 – Barcelona

ARCHITECT:
Anna Noguera Nieto
PROPERTY:
city Hall of Barcelona
PEM:
€ 1,324,649.30
SURFACE:
1,110.40 m2
DATE:
2014 – 2015

The intervention is located in the building of the Vall d’Hebron Fire Station, on the two floors immediately below the premises and facilities (access floor and semi-basement).
The project is an interior renovation of an existing building with a reinforced concrete structure and concrete block enclosures to house the central archive of the prevention, safety and mobility management and the information space of the fire brigade.

Pictures:

Facebook
LinkedIn